The pipeline that runs from Nawara in Gabes. At the heart of Tunisia, through the Tunisian desert to the border with Libya. The 24 “pipeline stretches 370 Km.
All welds are checked by automatic ultrasound machines.
The construction is carried out by Max Streicher in collaboration with local partner Bouchamaoui Industries.
Recent Posts